|
|
|
| 41. |
By Rowley, William D.
Published: 2006
|
Checked In (Verify) |
Share this
|
| 42. |
Published: 2005
|
Checked In (Verify) |
Access Online |
Share this
|
| 43. |
Published: 2005
Call Number: HS 5.102:D 18/CD
|
Checked In (Verify) |
Access Online |
Share this
|
| 44. |
By Leslie, Jacques, 1947-
Published: 2005
Call Number: 333.9162 L5656d
|
Checked In (Verify) |
Share this
|
| 45. |
Wallowa Lake Dam Rehabilition [sic] and Water Management Act of 2005 : report (to accompany S. 231).
[Government Document]
Preview
Published: 2005
|
Checked In (Verify) |
Access Online |
Share this
|
| 46. |
The future of large dams : dealing with social, environmental, institutional, and political costs
[Book]
Preview
By Scudder, Thayer.
Published: 2005
Call Number: 333.91 Scu24f
|
Checked In (Verify) |
Access Online |
Share this
|
| 47. |
Arthur V. Watkins Dam Enlargement Act of 2005 : report (to accompany H. R. 3626) (including cost estimate of the Congressional Budget Office).
[Government Document]
Preview
Published: 2005
|
Checked In (Verify) |
Access Online |
Share this
|
| 48. |
Federal guidelines for dam safety earthquake analyses and design of dams.
[Government Document]
Preview
Published: 2005
Call Number: HS 5.108:D 18/4
|
Checked In (Verify) |
Access Online |
Share this
|
| 49. |
The history of large federal dams planning, design, and construction in the era of big dams
[Government Document]
Preview
By Billington, David P.
Published: 2005
Call Number: I 27.2:D 18/23
|
Checked In (Verify) |
Access Online |
Share this
|
| 50. |
Roller-compacted concrete : design and construction considerations for hydraulic structures.
[Government Document]
Preview
Published: 2005
|
Checked In (Verify) |
Share this
|
|
In Nonfiction
|
|